A platform for all you plants.
The challenge
Enterprise-ready. From day one.
Manage plants, companies, and production structures on a single platform – from the front lines to plants around the world.
Centrally manage roles, permissions, standards, and organizational structures, and handle approvals according to the dual-control principle.
Integrate ERP, MES, CAQ, machines, and shop floor systems – via weasl Connect, REST API, OPC UA, or MQTT.
Operations every factory can rely on: SaaS from Germany, unlimited availability, monitored interfaces.
Global standard. Local execution.
Your headquarters define standards, templates, roles, and reporting procedures once. Each plant adapts these to local differences – language, machines, workstations, products, and variants. At the workstation, weasl executes every order and work step exactly as approved and reports back on quality and results.
Global standard. Local execution.
Your headquarters defines standards, templates, roles, and reporting procedures once. Each plant adapts these to local differences—language, machines, workstations, products, and variants. At the workstation, weasl executes every order and work step exactly as approved and reports back on quality and results.
Seamless integration
weasl imports orders, material data, bills of materials, and work plans from your core systems and guides your workers through their tasks error-free based on their qualifications and the specific variant—including process locks and quality gates. Results, process data, and inspection data are automatically fed back into the system. ERP and MES remain the leading systems, but weasl covers the “last mile.”
SAP
Hydra X
proALPHA
iTAC
sage
infor
REST
OPC UA
MQTT
Microsoft Dynamics 365
Tools: e.g., Atlas Copco, Siemens
Control systems: e.g., Beckhoff
Rollout from the first plant to the last
You decide how to get started: as a standalone solution, up and running from day one, or integrated with ERP, MES, and other systems—typically within 2 to 4 weeks. After 90 days at the pilot plant, you’ll see proof of your ROI directly through your improved key performance indicators. After that, you’ll roll out the solution in phases.
Phase 01 · Align
Define goals and scaling
Result
Rollout plan with pilot plant, phases, and control group
Completion criterion
Phase 02 · Connect
Start immediately or connect systems
Result
Data flows automatically between weasl and your systems
Pilot plant works with weasl without a preliminary IT project
Completion criterion
Phase 03 · Model
Map your organizational structures
Result
Organizational model for all plants
Completion criterion
Phase 04 · Standardize
Establish global standards
Result
Catalog of global standards with local flexibility
Completion criterion
Phase 05 · Pilot
Prove it at the pilot plant
Result
Pilot report with measured KPIs
Completion criterion
Phase 06 · Scale
Roll out in waves
Every work goes through the same seven steps:
Result
Every plant works productively with weasl
Completion criterion
Phase 07 · Govern
Control centrally
Result
Day-to-day operations with clear responsibilities
Completion criterion
Phase 01 · Align
Define goals and scaling
Result
Rollout plan with pilot plant, phases, and control group
Completion criterion
Phase 02 · Connect
Start immediately or connect systems
Result
Data flows automatically between weasl and your systems
Pilot plant works with weasl without a preliminary IT project
Completion criterion
Phase 03 · Model
Map your organizational structures
Result
Organizational model for all plants
Completion criterion
Phase 04 · Standardize
Establish global standards
Result
Catalog of global standards with local flexibility
Completion criterion
Phase 05 · Pilot
Prove it at the pilot plant
Result
Pilot report with measured KPIs
Completion criterion
Phase 06 · Scale
Roll out in waves
Every work goes through the same seven steps:
Result
Every plant works productively with weasl
Completion criterion
Phase 07 · Govern
Control centrally
Result
Day-to-day operations with clear responsibilities
Completion criterion
Frequently asked questions
No. As a standalone solution, weasl is ready to go from day one: Users and master data are imported or created in weasl, and the pilot project begins without integration. At the same time, you plan the integration with your systems.
Yes. You can import existing instructions from Excel, CSV, or PDF files. Departments can create new content using the drag-and-drop editor without needing IT support.
None in particular. weasl runs as a web application in a browser, on a tablet, PC, or industrial terminal.
Yes. Orders are sent to the system via the REST API, and status updates and responses are sent back – for example, to SAP, HYDRA X, proALPHA, or Microsoft Dynamics 365. We'd be happy to demonstrate this on your test system.
Yes. It maps companies, plants, lines, workstations, and stations exactly as they are. weasl Enterprise integrates operations across multiple plants, locations, and companies.
Yes. For example, you can centrally approve work instructions and roll them out to all plants with a single click. However, each plant also has the option to make local adjustments or work with its own instructions. You determine what applies globally and what can be adjusted locally.
weasl can support all the languages you need in your structures. German and English are defined by default; additional languages can be easily added through configuration.
As a stand-alone solution, weasl is ready to go from day one; when integrated with ERP, MES, and other systems, it’s typically up and running within 2 to 4 weeks. After 90 days at the pilot plant, you’ll receive proof of ROI based on your key metrics. After that, you’ll roll it out plant by plant in phases.
Yes. Every approved instruction is versioned, and the approval process – whether immediate or multi-step – follows the n-eyes principle. Documentation is generated as part of the process, and you can create audit logs with the click of a button.
We work with you to establish customized Service Level Agreements (SLAs) that are tailored to your business.
Benefits and testimonials
25–40%
shorter total lead time
50–60%
faster onboarding
60–70%
less rework due to errors
As confirmed by weasl customers such as Alpha Verteilertechnik, Confovis, and Staudinger.
"Thanks to weasl, we were able to integrate product planning and standardize the project management process at a global player in the pharmaceutical industry."
Your Next Step
Show us your structures, standards, and goals, and we'll show you how to use weasl to transform your enterprise globally.
"I'll discuss with you how we can efficiently implement the rollout at your company."
Eduard Daoud • Chief Revenue Officer
COMPANY
RESOURCES
GET IN TOUCH